Site Classifications
Also referred to as a soil test report or geotech report, this is a report prepared by a qualified geotechnical engineer on the soil conditions of your site, assessed in accordance with the Australian Standard. A high-level site classification report will be available from the Suburban Land Agency once earthworks are complete.
The Deposited Plan means the plan relating to the land and registered under Section 7 of the Districts Act 2002 (ACT). This defines the legal boundaries of land and often records subdivisions and easements. View the Deposited Plans by searching for them above.
Whitlam Verge Bond refund form
As part of the construction of your new home, you are required to protect the verge assets during construction and make good any damage upon completion of your landscape works. The verge includes the area forward of your property boundary line to the kerb and gutter.
To ensure the verges are returned to their original state post construction, a $1000 bond was required at the time of settlement. Within six months of receiving your certificate of occupancy and no later than 30 months after settlement of your block, and once the verge is returned back to its original and established condition, the bond can be reimbursed to you via the application form.
Don’t forget to keep your verge protected and complete your Whitlam Verge Bond application form.
Please contact the Suburban Land Agency on 02 6205 0600 if you have any questions on any of the above documents and resources.